From email: GANTT PROJECT x LAST PLANNER SYSTEM

this came by email

I work with Last Planner System, a system based on Lean Philosophy. But with Gantt Project lack a few things to work like Last Planner System. I think it could be a great point for Gantt Project. That’s a new methodology that’s in our present and it would be on our future. It’s a system that could be linked with BIM projects for architecture and engineering.

I am sure that there are many project management methodologies. Unfortunately, we can’t support all of them and we don’t aim to. If you feel that there is something very useful from Last Planner which could make sense with existing GanttProject features, please provide more details on that.