Hi, I am using version 3.1.3103 on macOS “Big Sur”.
When exporting to a PDF, the text in the left-hand pane of the Gantt chart (e.g. task names) does not appear:
When exporting the same project on a Windows machine, the text appears as normal.
Is this a known problem and is there a work-around?
Thanks!