Rescheduling multiple tasks via Ctrl + left mouse button

In an earlier version of GanttProject (v.2.8), one could select multiple tasks and reschedule them (i.e., move them left/right in the chart) by holding the Control key and dragging them using the left mouse button. This no longer works in the current version of the application (v.3.2.3246).

I tried other key combinations (Ctrl + Shift, Ctrl + Alt, Shift + Alt, Right Alt) but none worked either. Every time, only a single task (the one being dragged) was rescheduled.

Has the respective feature been removed?

Thank you.

It is a bug, will be fixed.

Ah, thank you. I am sorry, I completely missed the link to the GitHub repository mentioned on the website. :roll_eyes: